IMG_8507.JPG

 

Betton Road Traffic and

Pedestrian Enhancement Project

Tallahassee, Florida

Included the reconstruction and reconfiguration of Betton Road from Thomasville Road to Centerville Road.  The project included full depth reconstruction of the roadway, reduction of lane widths, and the addition of raised medians to calm traffic throughout the corridor.  Mid-block crossings were added and/or upgraded to increase pedestrian safety. Completed in 2022.

original?tenant=vbu-digital

Putnam Drive Sidewalk

Tallahassee, Florida

Project included the construction of approximately 3,000 linear feet of concrete sidewalk in the South City area of Tallahassee.  The project included extensive closed drainage systems to allow construction of the sidewalk in existing R/W.

Completed in 2020.

original?tenant=vbu-digital

Miller Street Rehabilitation

Live Oak, Florida

The project included full-depth reclamation of approximately 2,500 linear feet of severely deteriorated roadway in Live Oak, Florida.  Full depth reclamation significantly reduced the cost, construction time, and traffic disruptions within the corridor.  Completed in 2019.

original?tenant=vbu-digital

Ichetucknee Road

City of Live Oak, Florida

Included the construction of one (1) mile of rural, two-lane roadway. A portion of the project included reconstructing an existing graded roadway, while the remainder was new roadway through undeveloped property in Live Oak, Florida.

original?tenant=vbu-digital

SR 20 Resurfacing

FDOT District Three

Included the milling and resurfacing of a four-lane divided section of State Road 20 in Liberty County, including reconfiguration of the travel lanes, , drainage modifications, and ADA improvements.

original?tenant=vbu-digital

Mitchell Avenue Sidewalk

City of Tallahassee, Florida

Included the construction of 2,000 linear feet of sidewalk, roadway reconfiguration, and drainage system improvements in Midtown Tallahassee.  Completed in 2020.