Eutaw, Inc.

Engineering Utilities, Transportation, and Water

from Concept to Completion

Transportation

Walker Avenue Widening

Live Oak, Florida

Included the reconstruction of a two-lane rural section to a three-lane urban roadway with closed drainage systems.  Eutaw was responsible for design, permitting, and technical services during construction.  Completed in 2009.

SR 263 Capital Circle Multi-laning

FDOT - District Three

Subconsultant for a two-lane rural to six-lane divided urban section in Tallahassee, Florida.  Responsibilities include roadway design support, bridge hydraulics, and and stormwater design.

 State Road 79

FDOT-District Three

Lane P. Lucas was project manager and lead designer for three (3) separate projects for FDOT District Three to convert approximately 12 miles of rural two-lane roadway to a divided four-lane facility in Bay County, Florida

Ichetucknee Road

City of Live Oak, Florida

Included the construction of one (1) mile of rural, two-lane roadway.  A portion of the project included reconstructing an existing graded roadway, while the remainder was new roadway through undeveloped property in Live Oak, Florida.

 

SR 20 Resurfacing

FDOT District Three

Included the milling and resurfacing of a four-lane divided section of State Road 20 in Liberty County, including reconfiguration of the travel lanes, , drainage modifications, and ADA improvements.

 

East Park Avenue

City of Tallahassee, Florida

Lane P Lucas was the lead roadway and drainage design engineer for this 2.1 mile roadway reconstruction project.  The project consisted of converting two-lane rural roadway to a four-lane divided urban facility in a developed area of the City of Tallahassee.